India India · 12.557, 80.175

Madras

Madras, nuclear power plant in India, operates one pressurized heavy water reactor with 205 MW net installed capacity and has been in service since 1984. One more unit has its operation suspended.

Unit Madras 1 has been operating for 42 years, since 1984. Kalpakkam PFBR is under construction, with grid connection expected in 2026. Its 410 MW net are enough to supply about 1,290,000 households.

Country
India
Units
3
Technology
PHWR · FBR
Net capacity
205 MWe
First grid connection
1984
Operator
Nuclear Power Corporation Of India · Bharatiya Nabhikiya Vidyut Nigam
Owner
Nuclear Power Corporation Of India Ltd · Bharatiya Nabhikiya Vidyut Nigam Ltd
Status
Operating
Operating capacity
205 MWe
net electrical
Units
3
1 operating · 1 suspended
First start-up
1984
Madras
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Madras 1Pressurized heavy water (PHWR · CANDU)IPHWR-220Offline for refurbishment205801Jan 1971Jul 1983——
Madras 2Pressurized heavy water (PHWR · CANDU)IPHWR-220Operating205801Oct 1, 1972Sep 20, 1985—95.0 % (2024)
Kalpakkam PFBRFast breeder (FBR)—Under construction4701,253Oct 20042026 (planned)——

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · updated on Sep 17, 2026

Madras 1, a 205 MWe PHWR (IPHWR-220), started construction in 1971, was connected to the grid in 1983 and is currently suspended.

Madras 2, a 205 MWe PHWR (IPHWR-220), started construction in 1972, was connected to the grid in 1985 and is still operating, with a 95% load factor in 2024.

Kalpakkam PFBR, a 470 MWe FBR, has been under construction since 2004, with grid connection expected in 2026.

Operator: Nuclear Power Corporation Of India (Madras 1, Madras 2) · Bharatiya Nabhikiya Vidyut Nigam (Kalpakkam PFBR).

Owner: Nuclear Power Corporation Of India Ltd (Madras 1, Madras 2) · Bharatiya Nabhikiya Vidyut Nigam Ltd (Kalpakkam PFBR).