France France · 47.510, 2.875

Belleville

Belleville, nuclear power plant in France, operates 2 pressurized water reactors with 2,620 MW net installed capacity and has been in service since 1988.

Unit Belleville 1 has been operating for 38 years, since 1988. Its 2,620 MW net are enough to supply about 8,250,000 households.

Country
France
Units
2
Technology
PWR
Net capacity
2,620 MWe
First grid connection
1988
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
2,620 MWe
net electrical
Units
2
2 operating
First start-up
1988
Belleville
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Belleville 1Pressurized water (PWR)P4 REP 1300Operating1,3103,817May 1, 1980Oct 14, 1987—85.8 % (2024)
Belleville 2Pressurized water (PWR)P4 REP 1300Operating1,3103,817Aug 1, 1980Jul 6, 1988—82.0 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Belleville 1, a 1,310 MWe PWR (P4 REP 1300), started construction in 1980, was connected to the grid in 1987 and is still operating, with a 85.9% load factor in 2024.

Belleville 2, a 1,310 MWe PWR (P4 REP 1300), started construction in 1980, was connected to the grid in 1988 and is still operating, with a 82% load factor in 2024.

Operator: Electricité de France.

Owner: Electricité de France SA (Belleville 1, Belleville 2).

More information

Related plants