🇫🇷 France · 47.510, 2.875

Belleville

2 reactors PWR, in service since 1988. Today it delivers 2,620 MWe net, enough for about 8,253,000 households.

Operating capacity
2,620 MWe
net electrical
Units
2
2 operating
First start-up
1988
Belleville
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Belleville 1Pressurized water (PWR)P4 REP 1300Operating1,3103,817May 1, 1980Oct 14, 198785.8 % (2024)
Belleville 2Pressurized water (PWR)P4 REP 1300Operating1,3103,817Aug 1, 1980Jul 6, 198882.0 % (2024)

Operator: Electricité De France (EDF).

More information