🇫🇷 France · 47.510, 2.875
Belleville
2 reactors PWR, in service since 1988. Today it delivers 2,620 MWe net, enough for about 8,253,000 households.
Operating capacity
2,620 MWe
net electrical
Units
2
2 operating
First start-up
1988
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Belleville 1 | Pressurized water (PWR) | P4 REP 1300 | Operating | 1,310 | 3,817 | May 1, 1980 | Oct 14, 1987 | — | 85.8 % (2024) |
| Belleville 2 | Pressurized water (PWR) | P4 REP 1300 | Operating | 1,310 | 3,817 | Aug 1, 1980 | Jul 6, 1988 | — | 82.0 % (2024) |
Operator: Electricité De France (EDF).