China China · 22.694, 114.985

Taipingling

Taipingling, nuclear power plant in China, operates 2 pressurized water reactors with 2,232 MW net installed capacity and has been in service since 2026.

Taipingling 2-3 is under construction, with grid connection expected in 2028. Its 2,232 MW net are enough to supply about 7,030,000 households.

Country
China
Units
4
Technology
PWR
Net capacity
2,232 MWe
First grid connection
2026
Operator
CGN Huizhou Nuclear Power · CGN Huizhou Second Nuclear Power
Owner
China General Nuclear Power Group Co Ltd
Status
Operating
Operating capacity
2,232 MWe
net electrical
Units
4
2 operating
First start-up
2026

Units

Data: IAEA PRIS · Global Energy Monitor · editorial review · updated on Sep 21, 2026

Taipingling 1-1, a 1,116 MWe PWR (Hualong One (HPR1000)), started construction in 2019, was connected to the grid in 2026 and is still operating.

Taipingling 1-2, a 1,116 MWe PWR (Hualong One (HPR1000)), started construction in 2020, was connected to the grid in 2026 and is still operating.

Taipingling 2-3, a 1,209 MWe PWR (Hualong One (HPR1000)), has been under construction since 2025, with grid connection expected in 2028.

Taipingling 2-4, a 1,209 MWe PWR (Hualong One (HPR1000)), has been under construction since 2026.

Operator: CGN Huizhou Nuclear Power (Taipingling 1-1, Taipingling 1-2) · CGN Huizhou Second Nuclear Power (Taipingling 2-3, Taipingling 2-4).

Owner: China General Nuclear Power Group Co Ltd (Taipingling 1-1, Taipingling 1-2, Taipingling 2-3, Taipingling 2-4).

More information

Related plants