🇨🇳 China · 22.606, 114.553

Ling'ao

4 reactors PWR, in service since 2002. Today it delivers 3,914 MWe net, enough for about 12,329,100 households.

Operating capacity
3,914 MWe
net electrical
Units
4
4 operating
First start-up
2002

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Ling'ao 1-1Pressurized water (PWR)M310Operating9502,905May 15, 1997Feb 26, 200295.3 % (2024)
Ling'ao 1-2Pressurized water (PWR)M310Operating9502,905Nov 28, 1997Sep 14, 200289.6 % (2024)
Ling'ao 2-3Pressurized water (PWR)CPR-1000Operating1,0072,905Dec 15, 2005Jul 15, 201090.8 % (2024)
Ling'ao 2-4Pressurized water (PWR)CPR-1000Operating1,0072,905Jun 15, 2006May 3, 201189.1 % (2024)

Operator: Ling'ao Nuclear Power CO LTD (Ling'ao 1-1, Ling'ao 1-2) · Lingdong Nuclear Power CO LTD (Ling'ao 2-3, Ling'ao 2-4).

Owner: CGN Power CO LTD [70%]; Guangdong Nuclear Power Investment CO LTD [30%] (Ling'ao 1-1, Ling'ao 1-2) · CGNPC Nuclear Power Investment CO LTD[45%]; Guangdong Nuclear Power Investment CO LTD[30%]; CGN Power CO LTD[25%] (Ling'ao 2-3, Ling'ao 2-4).