China China · 22.606, 114.553

Ling'ao

Ling'ao, nuclear power plant in China, operates 4 pressurized water reactors with 3,914 MW net installed capacity and has been in service since 2002.

Unit Ling'ao 1-1 has been operating for 24 years, since 2002. Its 3,914 MW net are enough to supply about 12,300,000 households.

Country
China
Units
4
Technology
PWR
Net capacity
3,914 MWe
First grid connection
2002
Operator
Ling'ao Nuclear Power · Lingdong Nuclear Power
Owner
China General Nuclear Power Co Ltd · CGNPC Nuclear Power Investment Co Ltd
Status
Operating
Operating capacity
3,914 MWe
net electrical
Units
4
4 operating
First start-up
2002

Units

Data: IAEA PRIS · Global Energy Monitor · updated on Aug 1, 2026

Ling'ao 1-1, a 950 MWe PWR (Framatome M310 (M310)), started construction in 1997, was connected to the grid in 2002 and is still operating, with a 95.3% load factor in 2024.

Ling'ao 1-2, a 950 MWe PWR (Framatome M310 (M310)), started construction in 1997, was connected to the grid in 2002 and is still operating, with a 89.6% load factor in 2024.

Ling'ao 2-3, a 1,007 MWe PWR (CPR-1000), started construction in 2005, was connected to the grid in 2010 and is still operating, with a 90.9% load factor in 2024.

Ling'ao 2-4, a 1,007 MWe PWR (CPR-1000), started construction in 2006, was connected to the grid in 2011 and is still operating, with a 89.1% load factor in 2024.

Operator: Ling'ao Nuclear Power (Ling'ao 1-1, Ling'ao 1-2) · Lingdong Nuclear Power (Ling'ao 2-3, Ling'ao 2-4).

Owner: China General Nuclear Power Co Ltd (Ling'ao 1-1, Ling'ao 1-2) · CGNPC Nuclear Power Investment Co Ltd (Ling'ao 2-3, Ling'ao 2-4).