🇨🇳 China · 22.598, 114.543
Daya Bay
2 reactors PWR, in service since 1994. Today it delivers 1,930 MWe net, enough for about 6,079,500 households.
Operating capacity
1,930 MWe
net electrical
Units
2
2 operating
First start-up
1994

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Daya Bay 1 | Pressurized water (PWR) | M-310 | Operating | 944 | 2,905 | Aug 7, 1987 | Aug 31, 1993 | — | 71.6 % (2024) |
| Daya Bay 2 | Pressurized water (PWR) | M-310 | Operating | 986 | 2,905 | Apr 7, 1988 | Feb 7, 1994 | — | 98.6 % (2024) |
Operator: Daya Bay Nuclear Power Operations And Management CO LTD.
Owner: Guandong Nuclear Power Joint Venture Company LTD (Daya Bay 1, Daya Bay 2).