Ukraine Ukraine · 50.302, 26.647

Khmelnitski

Khmelnitski, nuclear power plant in Ukraine, operates 2 pressurized water reactors with 1,900 MW net installed capacity and has been in service since 1988.

Unit Khmelnitski 1 has been operating for 38 years, since 1988. Khmelnitski 3 is under construction, with grid connection expected in 2026. Its 1,900 MW net are enough to supply about 5,990,000 households.

Country
Ukraine
Units
4
Technology
PWR
Net capacity
1,900 MWe
First grid connection
1988
Operator
SE NNEGC "Energoatom"
Owner
SE NNEGC "Energoatom"
Status
Operating
Operating capacity
1,900 MWe
net electrical
Units
4
2 operating
First start-up
1988
Khmelnitski
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Khmelnitski 1Pressurized water (PWR)VVER-1000 (V-320)Operating9503,000Nov 1, 1981Dec 31, 1987—65.5 % (2021)
Khmelnitski 2Pressurized water (PWR)VVER-1000 (V-320)Operating9503,000Feb 1, 1985Aug 7, 2004—83.1 % (2021)
Khmelnitski 3Pressurized water (PWR)VVERUnder construction1,0353,132Mar 19862026 (planned)——
Khmelnitski 4Pressurized water (PWR)VVERUnder construction1,0353,132Feb 1987———

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Khmelnitski 1, a 950 MWe PWR (VVER-1000 (V-320)), started construction in 1981, was connected to the grid in 1987 and is still operating, with a 65.6% load factor in 2021.

Khmelnitski 2, a 950 MWe PWR (VVER-1000 (V-320)), started construction in 1985, was connected to the grid in 2004 and is still operating, with a 83.1% load factor in 2021.

Khmelnitski 3, a 1,035 MWe PWR (VVER), has been under construction since 1986, with grid connection expected in 2026.

Khmelnitski 4, a 1,035 MWe PWR (VVER), has been under construction since 1987.

Operator: SE NNEGC "Energoatom".

More information

Related plants