Tomari

Tomari, nuclear power plant in Japan, has 3 pressurized water reactors with 1,966 MW net installed capacity, with operation suspended.

Unit Tomari 1 has been operating for 37 years, since 1989. Its 1,966 MW net are enough to supply about 6,190,000 households.

Country
Japan
Units
3
Technology
PWR
Net capacity
1,966 MWe
First grid connection
1989
Operator
Hokkaido Electric Power
Owner
Hokkaido Electric Power Co Inc
Status
Operation suspended
Operating capacity
1,966 MWe
net electrical
Units
3
0 operating · 3 suspended
First start-up
1989
Tomari
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Tomari 1Pressurized water (PWR)Mitsubishi 2-loop (M 2LP)Offline, awaiting restart5501,650Apr 1985Dec 1988——
Tomari 2Pressurized water (PWR)Mitsubishi 2-loop (M 2LP)Offline, awaiting restart5501,650Jun 1985Aug 1990——
Tomari 3Pressurized water (PWR)Mitsubishi 3-loop (M 3LP)Offline, awaiting restart8662,660Nov 2004Mar 2009——

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Tomari 1, a 550 MWe PWR (Mitsubishi 2-loop (M 2LP)), started construction in 1985, was connected to the grid in 1988 and is currently suspended.

Tomari 2, a 550 MWe PWR (Mitsubishi 2-loop (M 2LP)), started construction in 1985, was connected to the grid in 1990 and is currently suspended.

Tomari 3, an 866 MWe PWR (Mitsubishi 3-loop (M 3LP)), started construction in 2004, was connected to the grid in 2009 and is currently suspended.

Operator: Hokkaido Electric Power.

Owner: Hokkaido Electric Power Co Inc (Tomari 1, Tomari 2, Tomari 3).