Japan Japan · 31.834, 130.189

Sendai

Sendai, nuclear power plant in Japan, operates 2 pressurized water reactors with 1,692 MW net installed capacity and has been in service since 1984.

Unit Sendai 1 has been operating for 42 years, since 1984. Its 1,692 MW net are enough to supply about 5,330,000 households.

Country
Japan
Units
2
Technology
PWR
Net capacity
1,692 MWe
First grid connection
1984
Operator
Kyushu Electric Power
Owner
Kyushu Electric Power Co Inc
Status
Operating
Operating capacity
1,692 MWe
net electrical
Units
2
2 operating
First start-up
1984
Sendai
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Sendai 1Pressurized water (PWR)Mitsubishi 3-loop (M 3LP)Operating8462,660Dec 15, 1979Sep 16, 1983—85.2 % (2024)
Sendai 2Pressurized water (PWR)Mitsubishi 3-loop (M 3LP)Operating8462,660Oct 12, 1981Apr 5, 1985—84.8 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Sendai 1, an 846 MWe PWR (Mitsubishi 3-loop (M 3LP)), started construction in 1979, was connected to the grid in 1983 and is still operating, with a 85.2% load factor in 2024.

Sendai 2, an 846 MWe PWR (Mitsubishi 3-loop (M 3LP)), started construction in 1981, was connected to the grid in 1985 and is still operating, with a 84.8% load factor in 2024.

Operator: Kyushu Electric Power.

Owner: Kyushu Electric Power Co Inc (Sendai 1, Sendai 2).