🇯🇵 Japan · 31.834, 130.189
Sendai
2 reactors PWR, in service since 1984. Today it delivers 1,692 MWe net, enough for about 5,329,800 households.
Operating capacity
1,692 MWe
net electrical
Units
2
2 operating
First start-up
1984
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Sendai 1 | Pressurized water (PWR) | Mitsubishi (3-loop) | Operating | 846 | 2,660 | Dec 15, 1979 | Sep 16, 1983 | — | 85.2 % (2024) |
| Sendai 2 | Pressurized water (PWR) | Mitsubishi (3-loop) | Operating | 846 | 2,660 | Oct 12, 1981 | Apr 5, 1985 | — | 84.8 % (2024) |
Operator: Kyushu Electric Power CO INC.