Xudapu
Xudapu, nuclear power plant under construction in China, will add 4 pressurized water reactors with 4,400 MW net projected capacity.
Xudapu 1-1 is under construction, with grid connection expected in 2028.
- Country
- China
- Units
- 4
- Technology
- PWR
- Net capacity
- —
- First grid connection
- 2027
- Operator
- CNNC Liaoning Nuclear Power
- Owner
- China National Nuclear Power Co Ltd
- Status
- Under construction
See also: alerts for this plant · every plant in China · Vendor: Dongfang Electric · every PWR reactor · how a PWR works
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Xudapu 1-1 | Pressurized water (PWR) | CAP1000 | Under construction | 1,000 | 2,905 | Nov 2023 | 2028 (planned) | — | — |
| Xudapu 1-2 | Pressurized water (PWR) | CAP1000 | Under construction | 1,000 | 2,905 | Jul 2024 | 2029 (planned) | — | — |
| Xudapu 2-3 | Pressurized water (PWR) | VVER-1200 (V-491) | Under construction | 1,200 | 3,200 | Jul 2021 | 2027 (planned) | — | — |
| Xudapu 2-4 | Pressurized water (PWR) | VVER-1200 (V-491) | Under construction | 1,200 | 3,200 | May 2022 | 2028 (planned) | — | — |
Data: IAEA PRIS · Global Energy Monitor · updated on Aug 1, 2026
Xudapu 1-1, a 1,000 MWe PWR (CAP1000), has been under construction since 2023, with grid connection expected in 2028.
Xudapu 1-2, a 1,000 MWe PWR (CAP1000), has been under construction since 2024, with grid connection expected in 2029.
Xudapu 2-3, a 1,200 MWe PWR (VVER-1200 (V-491)), has been under construction since 2021, with grid connection expected in 2027.
Xudapu 2-4, a 1,200 MWe PWR (VVER-1200 (V-491)), has been under construction since 2022, with grid connection expected in 2028.
Operator: CNNC Liaoning Nuclear Power.
Owner: China National Nuclear Power Co Ltd (Xudapu 1-1, Xudapu 1-2, Xudapu 2-3, Xudapu 2-4).