Jiangsu Xuwei
Jiangsu Xuwei, nuclear power plant under construction in China, will add one pressurized water reactor with 729 MW net projected capacity.
Jiangsu Xuwei 1-1 is under construction.
- Country
- China
- Units
- 1
- Technology
- PWR
- Net capacity
- —
- First grid connection
- —
- Operator
- CNNC Suneng Nuclear Power
- Owner
- China National Nuclear Corp [51%]; Jiangsu Guoxin Group Co Ltd [20%]; Lianyungang Jinlian Energy Investment Co Ltd [29%]
- Status
- Under construction
See also: alerts for this plant · every plant in China · Vendor: China First Heavy Industries · every PWR reactor · how a PWR works
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
—
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Jiangsu Xuwei 1-1 | Pressurized water (PWR) | Hualong One (HPR1000) | Under construction | 729 | 3,190 | Jan 2026 | — | — | — |
Data: IAEA PRIS · Global Energy Monitor · updated on Aug 1, 2026
Jiangsu Xuwei 1-1, a 729 MWe PWR (Hualong One (HPR1000)), has been under construction since 2026.
Operator: CNNC Suneng Nuclear Power.
Owner: China National Nuclear Corp [51%]; Jiangsu Guoxin Group Co Ltd [20%]; Lianyungang Jinlian Energy Investment Co Ltd [29%].