United States United States · 34.298, -81.315

Virgil C Summer

Virgil C Summer, nuclear power plant in United States, operates one pressurized water reactor with 973 MW net installed capacity and has been in service since 1984.

Unit Virgil C Summer 1 has been operating for 42 years, since 1984. Virgil C Summer 2 is under construction. Its 973 MW net are enough to supply about 3,060,000 households.

Country
United States
Units
3
Technology
PWR
Net capacity
973 MWe
First grid connection
1984
Operator
South Carolina Electric & Gas
Owner
South Carolina Electric & Gas Co
Status
Operating
Operating capacity
973 MWe
net electrical
Units
3
1 operating
First start-up
1984
Virgil C Summer
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLicence untilLoad factor
Virgil C Summer 1Pressurized water (PWR)Westinghouse 3-loop (WH 3LP)Operating9732,900Mar 21, 1973Nov 16, 1982—Aug 6, 204286.8 % (2024)
Virgil C Summer 2Pressurized water (PWR)AP1000Construction halted1,117—2013————
Virgil C Summer 3Pressurized water (PWR)AP1000Construction halted1,117—2013————

Data: IAEA PRIS · Wikipedia · editorial review · updated on Sep 21, 2026

Virgil C Summer 1, a 973 MWe PWR (Westinghouse 3-loop (WH 3LP)), started construction in 1973, was connected to the grid in 1982 and is still operating, with a 86.8% load factor in 2024.

Virgil C Summer 2, a 1,117 MWe PWR (AP1000), has been under construction since 2013.

Virgil C Summer 3, a 1,117 MWe PWR (AP1000), has been under construction since 2013.

Operator: South Carolina Electric & Gas.

Owner: South Carolina Electric & Gas Co (Virgil C Summer 1).

More information

Related plants