United States United States · 32.298, -97.785

Comanche Peak

Comanche Peak, nuclear power plant in United States, operates 2 pressurized water reactors with 2,400 MW net installed capacity and has been in service since 1990.

Unit Comanche Peak 1 has been operating for 36 years, since 1990. Its 2,400 MW net are enough to supply about 7,560,000 households.

Country
United States
Units
2
Technology
PWR
Net capacity
2,400 MWe
First grid connection
1990
Operator
Luminant Generation Company
Owner
Luminant Generation Company LLC
Status
Operating
Operating capacity
2,400 MWe
net electrical
Units
2
2 operating
First start-up
1990
Comanche Peak
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLicence untilLoad factor
Comanche Peak 1Pressurized water (PWR)Westinghouse 4-loop (WH 4LP)Operating1,2053,612Dec 19, 1974Apr 24, 1990—Feb 8, 205099.1 % (2024)
Comanche Peak 2Pressurized water (PWR)Westinghouse 4-loop (WH 4LP)Operating1,1953,612Dec 19, 1974Apr 9, 1993—Feb 2, 205388.7 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Comanche Peak 1, a 1,205 MWe PWR (Westinghouse 4-loop (WH 4LP)), started construction in 1974, was connected to the grid in 1990 and is still operating, with a 99.1% load factor in 2024.

Comanche Peak 2, a 1,195 MWe PWR (Westinghouse 4-loop (WH 4LP)), started construction in 1974, was connected to the grid in 1993 and is still operating, with a 88.7% load factor in 2024.

Operator: Luminant Generation Company.

Owner: Luminant Generation Company LLC (Comanche Peak 1, Comanche Peak 2).

More information

Related plants