Bilibino
Bilibino, nuclear power plant in Russia, operated 4 graphite-moderated light water reactors between 1974 and 2025 and is now shut down.
- Country
- Russia
- Units
- 4
- Technology
- LWGR
- Net capacity
- —
- First grid connection
- 1974
- Operator
- Rosenergoatom
- Owner
- Rosatom
- Status
- Shut down
See also: alerts for this plant · every plant in Russia · Vendor: Rosatom (Atomenergomash, Atomstroyexport) · every LWGR reactor · how a LWGR works
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Bilibino 1 | Graphite-moderated light water (LWGR / RBMK) | EGP-6 | Shut down | 11 | 62 | Jan 1970 | Jan 1974 | Mar 2018 | — |
| Bilibino 2 | Graphite-moderated light water (LWGR / RBMK) | EGP-6 | Shut down | 11 | 62 | Jan 1, 1970 | Dec 30, 1974 | Dec 2025 | 22.9 % (2024) |
| Bilibino 3 | Graphite-moderated light water (LWGR / RBMK) | EGP-6 | Shut down | 11 | 62 | Jan 1, 1970 | Dec 22, 1975 | Dec 2025 | 25.5 % (2024) |
| Bilibino 4 | Graphite-moderated light water (LWGR / RBMK) | EGP-6 | Shut down | 11 | 62 | Jan 1, 1970 | Dec 27, 1976 | Dec 2025 | 22.1 % (2024) |
Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026
Bilibino 1, an 11 MWe LWGR (EGP-6), started construction in 1970 and operated from 1974 to 2018.
Bilibino 2, an 11 MWe LWGR (EGP-6), started construction in 1970 and operated from 1974 to 2025.
Bilibino 3, an 11 MWe LWGR (EGP-6), started construction in 1970 and operated from 1975 to 2025.
Bilibino 4, an 11 MWe LWGR (EGP-6), started construction in 1970 and operated from 1976 to 2025.
Operator: Rosenergoatom.
Owner: Rosatom (Bilibino 1, Bilibino 2, Bilibino 3, Bilibino 4).