🇮🇳 India · 23.529, 74.591

Mahi Banswara

4 reactors PHWR, in service since 2029.

Operating capacity
0 MWe
net electrical
Units
4
0 operating
First start-up
2029

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Mahi Banswara 1Pressurized heavy water (PHWR · CANDU)rowspan=4|IPHWR-700Planned7002031 (planned)
Mahi Banswara 2Pressurized heavy water (PHWR · CANDU)630Planned7002029 (planned)
Mahi Banswara 3Pressurized heavy water (PHWR · CANDU)630Planned7002029 (planned)
Mahi Banswara 4Pressurized heavy water (PHWR · CANDU)630Planned7002029 (planned)

Operator: Nuclear Power Corporation Of India LTD.

More information