🇮🇳 India · 23.529, 74.591
Mahi Banswara
4 reactors PHWR, in service since 2029.
Operating capacity
0 MWe
net electrical
Units
4
0 operating
First start-up
2029
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Mahi Banswara 1 | Pressurized heavy water (PHWR · CANDU) | rowspan=4|IPHWR-700 | Planned | 700 | — | — | 2031 (planned) | — | — |
| Mahi Banswara 2 | Pressurized heavy water (PHWR · CANDU) | 630 | Planned | 700 | — | — | 2029 (planned) | — | — |
| Mahi Banswara 3 | Pressurized heavy water (PHWR · CANDU) | 630 | Planned | 700 | — | — | 2029 (planned) | — | — |
| Mahi Banswara 4 | Pressurized heavy water (PHWR · CANDU) | 630 | Planned | 700 | — | — | 2029 (planned) | — | — |
Operator: Nuclear Power Corporation Of India LTD.