🇮🇳 India · 29.441, 75.632
Gorakhpur Haryana
4 reactors PHWR · —, in service since 2029.
Operating capacity
0 MWe
net electrical
Units
4
0 operating
First start-up
2029
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Gorakhpur Haryana 1 | Pressurized heavy water (PHWR · CANDU) | PHWR-700 | Planned | 630 | — | — | 2029 (planned) | — | — |
| Gorakhpur Haryana 2 | Pressurized heavy water (PHWR · CANDU) | PHWR-700 | Planned | 630 | — | — | 2029 (planned) | — | — |
| Gorakhpur Haryana 3 | Other | 630 | Planned | 700 | — | — | 2031 (planned) | — | — |
| Gorakhpur Haryana 4 | Other | 630 | Planned | 700 | — | — | 2031 (planned) | — | — |
Operator: Nuclear Power Corporation Of India LTD.