Chutka
Chutka, planned nuclear power plant in India, is set to have 2 pressurized heavy water reactors with 1,260 MW net projected capacity.
- Country
- India
- Units
- 2
- Technology
- PHWR
- Net capacity
- —
- First grid connection
- 2031
- Operator
- Nuclear Power Corporation Of India
- Owner
- Nuclear Power Corporation Of India Ltd
- Status
- Planned
See also: alerts for this plant · every plant in India · every PHWR reactor · how a PHWR works
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2031
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Chutka 1 | Pressurized heavy water (PHWR · CANDU) | IPHWR-700 | Planned | 630 | — | — | 2031 (planned) | — | — |
| Chutka 2 | Pressurized heavy water (PHWR · CANDU) | IPHWR-700 | Planned | 630 | — | — | 2031 (planned) | — | — |
Data: Global Energy Monitor · Wikipedia · updated on Sep 17, 2026
Chutka 1, a 630 MWe PHWR (IPHWR-700), is planned, with grid connection expected in 2031.
Chutka 2, a 630 MWe PHWR (IPHWR-700), is planned, with grid connection expected in 2031.
Operator: Nuclear Power Corporation Of India.
Owner: Nuclear Power Corporation Of India Ltd (Chutka 1, Chutka 2).