India India · 22.770, 80.093

Chutka

Chutka, planned nuclear power plant in India, is set to have 2 pressurized heavy water reactors with 1,260 MW net projected capacity.

Country
India
Units
2
Technology
PHWR
Net capacity
—
First grid connection
2031
Operator
Nuclear Power Corporation Of India
Owner
Nuclear Power Corporation Of India Ltd
Status
Planned
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2031

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Chutka 1Pressurized heavy water (PHWR · CANDU)IPHWR-700Planned630——2031 (planned)——
Chutka 2Pressurized heavy water (PHWR · CANDU)IPHWR-700Planned630——2031 (planned)——

Data: Global Energy Monitor · Wikipedia · updated on Sep 17, 2026

Chutka 1, a 630 MWe PHWR (IPHWR-700), is planned, with grid connection expected in 2031.

Chutka 2, a 630 MWe PHWR (IPHWR-700), is planned, with grid connection expected in 2031.

Operator: Nuclear Power Corporation Of India.

Owner: Nuclear Power Corporation Of India Ltd (Chutka 1, Chutka 2).

More information

Related plants