🇮🇳 India · 22.770, 80.093

Chutka

2 reactors PHWR, in service since 2031.

Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2031

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Chutka 1Pressurized heavy water (PHWR · CANDU)rowspan=6| IPHWR-700Planned7002031 (planned)
Chutka 2Pressurized heavy water (PHWR · CANDU)630Planned7002031 (planned)

Operator: Nuclear Power Corporation Of India LTD.

More information