🇨🇳 China · 21.639, 108.278

Bailong

2 reactors PWR, in service since 2026.

Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2026

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Bailong 1Pressurized water (PWR)CAP-1000Planned1,25020252026 (planned)
Bailong 2Pressurized water (PWR)CAP-1000Planned1,25020262027 (planned)

Operator: CPI Guangxi Nuclear Power CO LTD.

Owner: State Nuclear Power Technology CO LTD (Bailong 1, Bailong 2).

More information