🇨🇳 China · 21.639, 108.278
Bailong
2 reactors PWR, in service since 2026.
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2026
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Bailong 1 | Pressurized water (PWR) | CAP-1000 | Planned | 1,250 | — | 2025 | 2026 (planned) | — | — |
| Bailong 2 | Pressurized water (PWR) | CAP-1000 | Planned | 1,250 | — | 2026 | 2027 (planned) | — | — |
Operator: CPI Guangxi Nuclear Power CO LTD.
Owner: State Nuclear Power Technology CO LTD (Bailong 1, Bailong 2).