🇧🇾 Belarus · 54.760, 26.094
Astravets
2 reactors PWR, in service since 2021. Today it delivers 2,220 MWe net, enough for about 6,993,000 households.
Operating capacity
2,220 MWe
net electrical
Units
2
2 operating
First start-up
2021

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Astravets 1 | Pressurized water (PWR) | VVER-1200/V-491 | Operating | 1,110 | 3,200 | Nov 8, 2013 | Nov 3, 2020 | — | 82.6 % (2024) |
| Astravets 2 | Pressurized water (PWR) | VVER-1200/V-491 | Operating | 1,110 | 3,200 | Apr 27, 2014 | May 13, 2023 | — | 68.6 % (2024) |
Operator: Republican Unitary Enterprise "Belarusian Nuclear Power Plant".