🇺🇸 United States · 35.227, -85.092
Sequoyah
2 reactors PWR, in service since 1981. Today it delivers 2,291 MWe net, enough for about 7,216,650 households.
Operating capacity
2,291 MWe
net electrical
Units
2
2 operating
First start-up
1981

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Sequoyah 1 | Pressurized water (PWR) | WH 4-Loop (ICECOND) | Operating | 1,152 | 3,455 | May 27, 1970 | Jul 22, 1980 | — | 78.7 % (2024) |
| Sequoyah 2 | Pressurized water (PWR) | WH 4-Loop (ICECOND) | Operating | 1,139 | 3,455 | May 27, 1970 | Dec 23, 1981 | — | 55.0 % (2024) |
Operator: Tennessee Valley Authority (TVA).