🇹🇼 Taiwan · 25.282, 121.586

Jinshan

2 reactors BWR, in service since 1978.

Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
1978
Jinshan
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Jinshan 1Boiling water (BWR)BWR-4Shut down6041,840Jun 1972Nov 1977Dec 2018
Jinshan 2Boiling water (BWR)BWR-4Shut down6041,840Dec 1973Dec 1978Jul 2019

Operator: Taiwan Power CO.

More information