🇪🇸 Spain · 40.951, 0.866
Vandellos
2 reactors GCR · PWR, in service since 1972. Today it delivers 1,047 MWe net, enough for about 3,298,050 households.
Operating capacity
1,047 MWe
net electrical
Units
2
1 operating
First start-up
1972

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Vandellos 1 | Gas-cooled (GCR / AGR) | UNGG | Shut down | 480 | 1,670 | Jun 1968 | May 1972 | Jul 1990 | — |
| Vandellos 2 | Pressurized water (PWR) | WH 3 loops | Operating | 1,047 | 2,941 | Dec 29, 1980 | Dec 12, 1987 | — | 84.0 % (2024) |
Operator: Hispano-Francesa De Energia Nuclear SA (Vandellos 1) · Asociación Nuclear Ascó-Vandellós AIE (Vandellos 2).
Owner: Endesa; Iberdrola (Vandellos 2).