Nuclear power in Spain
Spain has 7 reactors operating with 7,123 MW net installed capacity, 18.8 % of its electricity. 3 shut down. First reactor connected in 1969.
Spain ranks 10th among the 32 countries with operating reactors by net capacity, and 11th by number of reactors. Its first reactor, Jose Cabrera 1, started operating in 1969, 57 years ago. Its operating fleet comprises 6 PWR and 1 BWR. The highest-capacity plant in operation is Almaraz, with 2,017 MW net, and the oldest unit still in service is Almaraz 1, operating since 1983. In total, 3 units have been permanently shut down, most recently Santa Maria De Garona in 2017.
PWR reactors in Spain · BWR reactors in Spain · GCR reactors in Spain · Rankings
Electricity generation mix
Share of electricity generation, 2025 (closest earlier year; 2026 has no data) · Ember
Click a source to show or hide it on the chart
Plants
| Plant | Units | Types | Status today | MWe operating |
|---|---|---|---|---|
| Almaraz | 2 | PWR | 2 operating | 2,017 |
| Ascó | 2 | PWR | 2 operating | 1,992 |
| Cofrentes | 1 | BWR | operating | 1,064 |
| Vandellos | 2 | GCR, PWR | operatingshut down | 1,047 |
| Trillo | 1 | PWR | operating | 1,003 |
| Jose Cabrera | 1 | PWR | shut down | — |
| Santa Maria De Garona | 1 | BWR | shut down | — |
Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026