Romania Romania · 44.997, 25.367

Doicești

Doicești, planned nuclear power plant in Romania, is set to have 6 small modular reactors with 462 MW gross projected capacity.

Country
Romania
Units
6
Technology
SMR
Net capacity
—
First grid connection
2030
Operator
Societatea Nationala Nuclearelectrica
Owner
—
Status
Planned
Operating capacity
0 MWe
net electrical
Units
6
0 operating
First start-up
2030

Units

Data: Global Energy Monitor · updated on Aug 1, 2026

Doicești 1, a 77 MWe gross SMR (NuScale), is planned, with grid connection expected in 2030.

Doicești 2, a 77 MWe gross SMR (NuScale), is planned, with grid connection expected in 2030.

Doicești 3, a 77 MWe gross SMR (NuScale), is planned, with grid connection expected in 2030.

Doicești 4, a 77 MWe gross SMR (NuScale), is planned, with grid connection expected in 2030.

Doicești 5, a 77 MWe gross SMR (NuScale), is planned, with grid connection expected in 2030.

Doicești 6, a 77 MWe gross SMR (NuScale), is planned, with grid connection expected in 2030.

Operator: Societatea Nationala Nuclearelectrica.