Japan Japan · 41.510, 140.913

Ohma

Ohma, nuclear power plant under construction in Japan, will add one boiling water reactor with 1,328 MW net projected capacity.

Ohma 1 is under construction, with grid connection expected in 2029.

Country
Japan
Units
1
Technology
BWR
Net capacity
—
First grid connection
2029
Operator
Electric Power Development
Owner
Electric Power Development Co Ltd
Status
Under construction
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2029
Ohma
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Ohma 1Boiling water (BWR)ABWRUnder construction1,3283,926May 7, 20102029 (planned)——

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · updated on Sep 17, 2026

Ohma 1, a 1,328 MWe BWR (ABWR), has been under construction since 2010, with grid connection expected in 2029.

Operator: Electric Power Development.

Owner: Electric Power Development Co Ltd.

More information

Related plants