Higashidori (Tepco)
Higashidori (Tepco), nuclear power plant under construction in Japan, will add one boiling water reactor with 1,343 MW net projected capacity.
Higashidori (Tepco) 1 is under construction.
- Country
- Japan
- Units
- 1
- Technology
- BWR
- Net capacity
- —
- First grid connection
- —
- Operator
- Tokyo Electric Power
- Owner
- Tokyo Electric Power Co
- Status
- Under construction
See also: alerts for this plant · every plant in Japan · Vendor: Hitachi · every BWR reactor · how a BWR works
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
—

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Higashidori (Tepco) 1 | Boiling water (BWR) | ABWR | Construction halted | 1,343 | 3,926 | Jan 2011 | — | — | — |
Data: IAEA PRIS · editorial review · updated on Sep 21, 2026
Higashidori (Tepco) 1, a 1,343 MWe BWR (ABWR), has been under construction since 2011.
Operator: Tokyo Electric Power.
Owner: Tokyo Electric Power Co.