Higashidori (Tepco)
Higashidori (Tepco), nuclear power plant in Japan, operates one boiling water reactor with 1,385 MW net installed capacity and has been in service since 2005.
Unit Higashidori (Tepco) 1 has been operating for 21 years, since 2005. Its 1,385 MW net are enough to supply about 4,360,000 households.
- Country
- Japan
- Units
- 1
- Technology
- BWR
- Net capacity
- 1,385 MWe
- First grid connection
- 2005
- Operator
- Tokyo Electric Power
- Owner
- Tokyo Electric Power Co
- Status
- Operating
See also: alerts for this plant · every plant in Japan · every BWR reactor · how a BWR works
Operating capacity
1,385 MWe
net electrical
Units
1
1 operating
First start-up
2005

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Higashidori (Tepco) 1 | Boiling water (BWR) | BWR-5 | Operation suspended | 1,385 | — | 2000 | 2005 | — | — |
Data: Global Energy Monitor · Wikipedia · updated on Sep 2, 2026
Higashidori (Tepco) 1, a 1,385 MWe BWR (BWR-5), started construction in 2000, was connected to the grid in 2005 and is currently suspended.
Operator: Tokyo Electric Power.
Owner: Tokyo Electric Power Co.