🇮🇷 Iran · 30.708, 48.364

Darkhovain

One reactor PWR, in service since 2030.

Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2030

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Darkhovain 1Pressurized water (PWR)IR-360Planned3301,1132030 (planned)

Operator: Nuclear Power Production And Development CO Of Iran.

More information