🇪🇬 Egypt · 31.044, 28.498
El Dabaa
4 reactors PWR, in service since 2028.
Operating capacity
0 MWe
net electrical
Units
4
0 operating
First start-up
2028

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| El Dabaa 1 | Pressurized water (PWR) | VVER-1200/V-529 | Under construction | 1,100 | 3,200 | Jul 2022 | 2028 (planned) | — | — |
| El Dabaa 2 | Pressurized water (PWR) | VVER-1200/V-529 | Under construction | 1,100 | 3,200 | Nov 2022 | 2029 (planned) | — | — |
| El Dabaa 3 | Pressurized water (PWR) | VVER-1200/V-529 | Under construction | 1,100 | 3,200 | May 3, 2023 | 2029 (planned) | — | — |
| El Dabaa 4 | Pressurized water (PWR) | VVER-1200/V-529 | Under construction | 1,100 | 3,200 | Jan 2024 | 2029 (planned) | — | — |
Operator: Nuclear Power Plants Authority.
Owner: Nuclear Power Plants Authority (El Dabaa 4).