Egypt Egypt · 31.044, 28.498

El Dabaa

El Dabaa, nuclear power plant under construction in Egypt, will add 4 pressurized water reactors with 4,400 MW net projected capacity.

El Dabaa 1 is under construction, with grid connection expected in 2028.

Country
Egypt
Units
4
Technology
PWR
Net capacity
—
First grid connection
2028
Operator
Nuclear Power Plants Authority
Owner
Nuclear Power Plants Authority
Status
Under construction
Operating capacity
0 MWe
net electrical
Units
4
0 operating
First start-up
2028
El Dabaa
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
El Dabaa 1Pressurized water (PWR)VVER-1200Under construction1,1003,200Jul 20222028 (planned)——
El Dabaa 2Pressurized water (PWR)VVER-1200Under construction1,1003,200Nov 20222029 (planned)——
El Dabaa 3Pressurized water (PWR)VVER-1200Under construction1,1003,200May 3, 20232029 (planned)——
El Dabaa 4Pressurized water (PWR)VVER-1200Under construction1,1003,200Jan 20242030 (planned)——

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · updated on Sep 17, 2026

El Dabaa 1, a 1,100 MWe PWR (VVER-1200), has been under construction since 2022, with grid connection expected in 2028.

El Dabaa 2, a 1,100 MWe PWR (VVER-1200), has been under construction since 2022, with grid connection expected in 2029.

El Dabaa 3, a 1,100 MWe PWR (VVER-1200), has been under construction since 2023, with grid connection expected in 2029.

El Dabaa 4, a 1,100 MWe PWR (VVER-1200), has been under construction since 2024, with grid connection expected in 2030.

Operator: Nuclear Power Plants Authority.

Owner: Nuclear Power Plants Authority (El Dabaa 4).