🇧🇩 Bangladesh · 24.066, 89.045
Rooppur
2 reactors PWR, in service since 2026.
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2026

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Rooppur 1 | Pressurized water (PWR) | VVER-1200/V-523 | Under construction | 1,080 | 3,200 | Nov 2017 | 2026 (planned) | — | — |
| Rooppur 2 | Pressurized water (PWR) | VVER-1200/V-523 | Under construction | 1,080 | 3,200 | Jul 2018 | 2027 (planned) | — | — |
Operator: Nuclear Power Plant Company Bangladesh LTD.
Owner: Bangladesh Atomic Energy Commission (Rooppur 1, Rooppur 2).