Detected events
Each event shows when it occurred and when the pipeline detected it. The gap between both is the real latency of each source, not a promise. Everything links to the original data.
Wednesday, April 29, 2026
Tuesday, April 28, 2026
Browns Ferry 3 was taken offline (56% → 0%)
Hatch 1 returned to service (0% → 19%)
ABB Motors and Mechanical: The following is a summary of information provided by ABB Motors and Mechanical (ABB) via phone and email:
EN Revision Imported Date: 8/17/2026 EN Revision Text: INTERIM PART 21 REPORT - VALVE ASSEMBLY MOTOR FAILURE The following is a summary of information provided by ABB Motors and Mechanical (ABB) via phone and email: Potential defects were identified in safety-related motors supplied via Flowserve. Flowserve and ABB were informed that during commissioning of a new SBD-3 actuator and valve assembly, the actuator motor …
Monday, April 27, 2026
Browns Ferry 3 reduced output from 100% to 56%
Limerick 1 was taken offline (80% → 0%)
Quad Cities 2 increased its power output from 35% to 100%
Sunday, April 26, 2026
Saint-Laurent 2: Unit Shutdown
EDF, April 26, 2026: “Shutdown of Production Unit No. 2 at the Saint-Laurent Power Plant due to a...”. Tags: Production.
Ginna increased its output from 53% to 88%
South Texas 1 increased its output from 78% to 100%
Saturday, April 25, 2026
Browns Ferry 1 increased its output from 47% to 76%
Ginna increased output by 2% → 53%
McGuire 2 increased its output from 45% to 87%
South Texas 1 increased its power output from 56% to 78%
Friday, April 24, 2026
Browns Ferry 1 returned to service (0% → 47%)
Ginna returned to service (0% → 2%)
Unit 1 was taken offline (100% → 0%)
McGuire 2 increased its output from 16% to 45%
Quad Cities 2 returned to service (0% → 15%)
South Texas 1 increased its output from 14% to 56%
Thursday, April 23, 2026
South Texas 1 returned to service (0% → 14%)
Wednesday, April 22, 2026
McGuire 2 reduced output from 45% to 15%
Tuesday, April 21, 2026
McGuire 2 increased its power output by 16% → 45%
Monday, April 20, 2026
Braidwood 2 was taken offline (77% → 0%)
Sunday, April 19, 2026
Brunswick 1 increased its power output from 30% to 86%
LaSalle 2 increased its output from 55% to 100%
McGuire 2 returned to service (0% → 15%)
Nine Mile Point 1 increased its power output from 78% to 100%
Vogtle 3 went offline (100% → 0%)
Saturday, April 18, 2026
Browns Ferry 1 went offline (17% → 0%)
Catawba 1 went offline (92% → 0%)
Nine Mile Point 1 reduced its output from 100% to 78%
Saint Lucie 2 was taken offline (78% → 0%)
Watts Bar 1 went offline (95% → 0%)
Friday, April 17, 2026
Browns Ferry 1 reduced its output from 100% to 17%
Thursday, April 16, 2026
Catawba 2 increased its output by 13% → 97%
Summer capacity increased by 14% → 96%
Wednesday, April 15, 2026
Brunswick 1 returned to service (0% → 2%)
Catawba 2 returned to service (0% → 13%)
Dresden 3 increased its output from 15% to 100%
Point Beach 2 increased its power output from 69% to 94%
Saint Lucie 2 reduced its output from 100% to 65%
Summer reduced power output from 100% to 14%
Tuesday, April 14, 2026
Dresden 3 returned to service (0% → 15%)
Point Beach 2 increased its power output from 28% to 69%
Monday, April 13, 2026
Millstone 2 was taken offline (87% → 0%)
Sunday, April 12, 2026
Summer increased output from 48% → 100%
Surry 2 went offline (100% → 0%)
Saturday, April 11, 2026
LaSalle 2 reduced output from 100% to 38%
Point Beach 2 returned to service (0% → 9%)
Friday, April 10, 2026
Hope Creek 1 reduced its output from 100% to 80%
Summer returned to service (0% → 43%)
Thursday, April 9, 2026
Browns Ferry 1 increased its output from 78% to 100%
Wednesday, April 8, 2026
Browns Ferry 1 reduced its output from 100% to 78%
Dresden 3 was taken offline (100% → 0%)
Grand Gulf 1 increased its output from 78% to 100%
Monticello increased its output from 30% to 100%
Tuesday, April 7, 2026
Grand Gulf 1 reduced output from 100% to 78%
Monday, April 6, 2026
Ginna was taken offline (83% → 0%)
Grand Gulf 1 increased its power output from 71% to 100%
Nine Mile Point 2 increased its power output from 39% to 100%
Sunday, April 5, 2026
Beaver Valley 2 went offline (95% → 0%)
Byron 1 increased its power output from 62% to 90%
Grand Gulf 1 reduced its output from 94% to 71%
Monticello reduced output from 87% to 25%
Salem 2 was taken offline (97% → 0%)
Vogtle 1 increased its power output from 65% to 96%
Saturday, April 4, 2026
Evento sin nivel INES · Bushehr 1 (Irán): A projectile struck near the premises of the Bushehr Nuclear Power Plant
On 04 April 2026, Iran Nuclear Regulatory Authority was informed by the operator of Bushehr Nuclear Power Plant (BNPP-1) that on 4 April at approximately 08:30 Iran Standard Time (IRST), a projectile struck near the premises of the power plant (very close to the BNPP-1 fence) due to the aerial and missile attacks by the Israel regime and the United States of America. A building on-site has been affected by shockwaves…
Evento sin nivel INES · Khuzestan province (Irán): Aerial and missile attacks on several Petrochemical complexes in Khuzestan province by the Israel regime and the United States of America
On 04 April, the Iran Nuclear Regulatory Authority was notified that several Petrochemical complexes in Khuzestan province, which use sealed Co 60 and Cs 137 sources for gauging, had been subjected to aerial and missile strikes by the Israel regime and the United States of America. No increase in radiation levels or any contamination has been detected outside theboundary of complexes.