United States United States · 31.934, -82.345

Edwin I Hatch

Edwin I Hatch, nuclear power plant in United States, operates 2 boiling water reactors with 1,759 MW net installed capacity and has been in service since 1975.

Unit Edwin I Hatch 1 has been operating for 51 years, since 1975. Its 1,759 MW net are enough to supply about 5,540,000 households.

Country
United States
Units
2
Technology
BWR
Net capacity
1,759 MWe
First grid connection
1975
Operator
Southern Nuclear Operating Company
Owner
Georgia Power Co
Status
Operating
Operating capacity
1,759 MWe
net electrical
Units
2
2 operating
First start-up
1975
Edwin I Hatch
Photo: Wikimedia Commons · author and license

Units

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Edwin I Hatch 1, an 876 MWe BWR (GE BWR/4, Mark I containment (BWR-4 (Mark 1))), started construction in 1968, was connected to the grid in 1974 and is still operating, with a 81.5% load factor in 2024.

Edwin I Hatch 2, an 883 MWe BWR (GE BWR/4, Mark I containment (BWR-4 (Mark 1))), started construction in 1972, was connected to the grid in 1978 and is still operating, with a 88.3% load factor in 2023.

Operator: Southern Nuclear Operating Company.

Owner: Georgia Power Co (Edwin I Hatch 1, Edwin I Hatch 2).

More information

Related plants