Switzerland Switzerland · 47.601, 8.184

Leibstadt

Leibstadt, nuclear power plant in Switzerland, operates one boiling water reactor with 1,233 MW net installed capacity and has been in service since 1984.

It is the highest-capacity nuclear plant in Switzerland. Unit Leibstadt has been operating for 42 years, since 1984. Its 1,233 MW net are enough to supply about 3,880,000 households.

Country
Switzerland
Units
1
Technology
BWR
Net capacity
1,233 MWe
First grid connection
1984
Operator
Kernkraftwerk Leibstadt
Owner
Kernkraftwerk Leibstadt
Status
Operating
Operating capacity
1,233 MWe
net electrical
Units
1
1 operating
First start-up
1984
Leibstadt
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
LeibstadtBoiling water (BWR)BWR-6Operating1,2333,600Jan 1, 1974May 24, 1984—89.0 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Leibstadt, a 1,233 MWe BWR (BWR-6), started construction in 1974, was connected to the grid in 1984 and is still operating, with a 89% load factor in 2024.

Operator: Kernkraftwerk Leibstadt.