🇷🇺 Russia · 69.709, 170.301

Akademik Lomonosov

2 reactors PWR, in service since 2020. Today it delivers 64 MWe net, enough for about 201,600 households.

Operating capacity
64 MWe
net electrical
Units
2
2 operating
First start-up
2020
Akademik Lomonosov
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Akademik Lomonosov 1Pressurized water (PWR)KLT-40SOperating32150Apr 15, 2007Dec 19, 201951.5 % (2024)
Akademik Lomonosov 2Pressurized water (PWR)KLT-40SOperating32150Apr 15, 2007Dec 19, 201927.3 % (2024)

Operator: Rosenergoatom.

Owner: Rosatom (Akademik Lomonosov 1, Akademik Lomonosov 2).

More information