Neckarwestheim
Neckarwestheim, nuclear power plant in Germany, operated 2 pressurized water reactors between 1976 and 2023 and is now shut down.
- Country
- Germany
- Units
- 2
- Technology
- PWR
- Net capacity
- —
- First grid connection
- 1976
- Operator
- EnBW Kernkraft
- Owner
- EnBW Energie Baden-Württemberg AG · EnBW Kernkraft GmbH
- Status
- Shut down
See also: alerts for this plant · every plant in Germany · Vendor: Siemens / Kraftwerk Union · every PWR reactor · how a PWR works
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
1976

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Neckarwestheim 1 | Pressurized water (PWR) | Siemens-KWU (KWU) | Shut down | 785 | 2,497 | Feb 1972 | Jun 1976 | Aug 2011 | — |
| Neckarwestheim 2 | Pressurized water (PWR) | Konvoi (Siemens-KWU) (Konvoi) | Shut down | 1,310 | 3,850 | Nov 1982 | Jan 1989 | Apr 2023 | — |
Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026
Neckarwestheim 1, a 785 MWe PWR (Siemens-KWU (KWU)), started construction in 1972 and operated from 1976 to 2011.
Neckarwestheim 2, a 1,310 MWe PWR (Konvoi (Siemens-KWU) (Konvoi)), started construction in 1982 and operated from 1989 to 2023.
Operator: EnBW Kernkraft.
Owner: EnBW Energie Baden-Württemberg AG (Neckarwestheim 1) · EnBW Kernkraft GmbH (Neckarwestheim 2).