Gundremmingen
Gundremmingen, nuclear power plant in Germany, operated 3 boiling water reactors between 1967 and 2021 and is now shut down.
- Country
- Germany
- Units
- 3
- Technology
- BWR
- Net capacity
- —
- First grid connection
- 1967
- Operator
- Kernkraftwerke Gundremmingen Betriebsgesellschaft · Kernkraftwerk Gundremmingen
- Owner
- RWE Power AG
- Status
- Shut down
See also: alerts for this plant · every plant in Germany · Vendor: Siemens / Kraftwerk Union · every BWR reactor · how a BWR works

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Gundremmingen A | Boiling water (BWR) | GE, BWR-1 | Shut down | 237 | 801 | Dec 1962 | Dec 1966 | Jan 1977 | — |
| Gundremmingen B | Boiling water (BWR) | KWU BWR, '72 design line (BWR-72) | Shut down | 1,284 | 3,840 | Jul 1976 | Mar 1984 | Dec 2017 | — |
| Gundremmingen C | Boiling water (BWR) | KWU BWR, '72 design line (BWR-72) | Shut down | 1,288 | 3,840 | Jul 1976 | Nov 1984 | Dec 2021 | — |
Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026
Gundremmingen A, a 237 MWe BWR (GE, BWR-1), started construction in 1962 and operated from 1966 to 1977.
Gundremmingen B, a 1,284 MWe BWR (KWU BWR, '72 design line (BWR-72)), started construction in 1976 and operated from 1984 to 2017.
Gundremmingen C, a 1,288 MWe BWR (KWU BWR, '72 design line (BWR-72)), started construction in 1976 and operated from 1984 to 2021.
Operator: Kernkraftwerke Gundremmingen Betriebsgesellschaft (Gundremmingen A) · Kernkraftwerk Gundremmingen (Gundremmingen B, Gundremmingen C).
Owner: RWE Power AG (Gundremmingen B, Gundremmingen C).