Smart signals
No agency publishes these: our engine infers them by crossing sources and detecting patterns.
Define what should reach you, over which part of the fleet and how urgently. The preview runs your criteria over the real events already ingested and tells you how many alerts you would have received in the last 30 days. You can create as many alerts as you like, each with its own criteria and cadence.
Which part of the fleet you want to listen to.
Filter by the level of each item: one specific to a plant, one that speaks of a whole country without naming any, or an international one. Empty = all three.
Pick the families that matter to you, then fine-tune type by type.
No agency publishes these: our engine infers them by crossing sources and detecting patterns.
When a unit stops generating, when it comes back and when it reduces power.
Life milestones of a plant and the pulse of the power system around it.
What the regulator records: notifications, licences, INES scale.
Statements from operators, regulators and governments about a specific plant.
Earthquakes near a plant. Context for reading the rest of the signals.
Cross-cutting topics, whatever the signal type or plant. Empty = all.
— detected
Two layers: direct signals, which mirror what official sources publish the moment they publish it, and smart signals, which our engine infers by crossing sources and detecting patterns before they make the news.
SADI demand above forecast and, within the same 30-minute window, a relevant generation drop. The system is covering a gap.
An M≥4.5 earthquake within 150 km of a plant opens a 72-hour window on its units. If one reduces power inside the window, the quake is promoted from context to possible impact and the signal links both events. Nobody publishes that correlation.
A unit drops to 0 % in the NRC report with no associated regulatory notification in the window. It marks the gap between what happened and what was reported.
The same unit with three or more power reductions in fourteen days. An outage precursor, not an isolated event.
Weather plus availability. Anticipates the summer power cuts of French reactors before they happen.
The return date of an announced outage slips. The event that moves prices most.
Wind forecast, expected demand and thermal unavailability crossed.
If a unit trips for a design cause, the probability for its twin rises.
A unit goes from generating to zero without notice: trip, scram or forced unavailability.
Refueling or announced maintenance.
The return date of an existing outage slips. The event that moves prices most.
The unit generates again after an outage.
Power reduction without leaving service.
Relevant change of power, or of generation by technology, between readings.
Actual demand departs from the system operator forecast beyond the threshold.
First synchronization of a new unit.
Nuclear start-up of a new unit.
First nuclear concrete.
Permanent retirement from service.
Reportable notification to the regulator, inspection finding, emergency activation.
License extension or restart authorization.
Event rated on the INES scale.
Press release or news item published by the operator, the regulator or the government, with the original title and a link to the source.
M≥4.5 earthquake within 150 km of a plant. Context, not an incident.