System stress (AR)
Demand above forecast alongside a generation drop in the Argentine system.
Choose what to receive, which countries or facilities to follow, and how often. The preview applies your criteria to a sample of up to 200 events from the last 30 days.
Loading your settings…
Direct signals about reported events and operational changes, and smart signals that connect those events to detect patterns.
Demand above forecast alongside a generation drop in the Argentine system.
Connects a nearby earthquake with subsequent power changes. Timing alone does not establish causation.
An observed outage without an associated regulatory notification in the Atlas. Consult the original report for context.
Repeated power reductions at the same unit, with links to the observed events.
Disruptions and shortages reported by reactors, processors and authorities, organised by isotope and region.
A unit goes from generating to zero without notice: trip, scram or forced unavailability.
Refueling or announced maintenance.
The return date of an existing outage slips.
The unit generates again after an outage.
Power reduction without leaving service.
Relevant change of power, or of generation by technology, between readings.
Actual demand departs from the system operator forecast beyond the threshold.
First synchronization of a new unit.
Nuclear start-up of a new unit.
First nuclear concrete.
Permanent retirement from service.
Reportable notification to the regulator, inspection finding, emergency activation.
License extension or restart authorization.
Event rated on the INES scale.
Announcement about an event, decision or development in the nuclear sector, with a date and link to the official source.
News about an event in the nuclear sector, with a date and link to the source.
M≥4.5 earthquake within 150 km of a plant. Context, not an incident.