Methodology

How this map is built

Every figure in Reactor Atlas comes from a named public source, carries a date, and can be traced from the sheet where it appears. This page sets out where each figure comes from, which source prevails when two disagree, how often it updates, and what you will not find here. When two sources disagree, both readings are kept: neither is deleted.

What Reactor Atlas shows

Limits and coverage

Sources, by layer

Each layer combines a fixed set of sources. Every plant, research-reactor and country sheet closes with the line "Data: … · updated on …", naming the sources behind those figures and the most recent of their dates.

Power reactors

SourceLicenseWhat it contributes
Global Energy Monitor, Global Nuclear Power TrackerCC BY 4.0, with modificationsAugust 2026 edition. Gross capacity, status, dates, owners and coordinates.
IAEA PRIS (RDS-2 and OPEX)IAEA, cited with attribution and the reading dateRDS-2 and OPEX 2025 edition, cut off on 31 December 2024. Net and gross capacity, status, connection dates and load factors.
Wikipedia, List of commercial nuclear reactorsCC BY-SA 4.0Consulted on every data update. Status, net capacity and day-level dates where PRIS and GEM don't give them.
Wikidata / Wikimedia CommonsWikidata CC0; Commons images, per each file's licenseCoordinates, images and links. Capacity is not taken from here: units are not consistent across records.

Research reactors

SourceLicenseWhat it contributes
IAEA Research Reactor Database (RRDB)IAEA, cited with attribution and the reading dateType, thermal power, status and coordinates. The main source for this layer.
Wikipedia, List of nuclear research reactorsCC BY-SA 4.0Complement and cross-check for the RRDB.
WikidataCC0Coordinates and identifiers.
U.S. NavyPublic domain (U.S. government work)Additions of moored training ships with a reactor (converted former submarines) that the RRDB doesn't list.

Fuel cycle

SourceLicenseWhat it contributes
WikipediaCC BY-SA 4.0The layer's main source by volume: name, status, capacity and product for most facilities.
WikidataCC0Second source by volume: identifiers and coordinates for most facilities.
World Nuclear Association, information libraryCited page by pageCategory series — mining, conversion, enrichment, fabrication, reprocessing, uranium deposits — that contribute status and capacity for much of the layer.
CNEA (Argentina)Each release belongs to its issuer; the original is linkedArgentine fuel-cycle facilities: mining, enrichment, fuel fabrication, heavy water and on-site storage.
SFEN (France)Each release belongs to its issuer; the original is linkedHistoric uranium mines in France.

Countries and electricity mix

SourceLicenseWhat it contributes
World Nuclear Association, country table© World Nuclear Association — country table, cited with a link to the original pageOperable and under-construction reactors by country: country-level figures, never per reactor.
Ember, Yearly Electricity DataCC BY 4.0Share of each source in a country's electricity generation, not primary energy.
Our World in Data (with Ember and the Energy Institute)OWID CC BY 4.0; the underlying Ember and Energy Institute data keep their own termsLong series of nuclear's share of electricity generation; it coexists with Ember's reading, not replaces it.

Real-time signals

SourceLicenseWhat it contributes
CAMMESA (Argentina's grid operator)CAMMESA public dataPublic data from the Argentine system operator: per-unit status for Atucha I, Atucha II and Embalse.
U.S. Nuclear Regulatory CommissionPublic domain (U.S. government work)Daily per-reactor status report and reportable event notifications.
KHNP (Korea Hydro & Nuclear Power)KHNP public dataPer-unit status at Kori, Hanbit, Hanul, Wolsong and Saeul, South Korea.
VattenfallVattenfall public dataProduction and status per unit at Forsmark and Ringhals, Sweden.
Elexon BMRSElexon open data (BSC)REMIT unavailability notices, United Kingdom.
IESO OntarioIESO public reportsGenerator output and capability, Canada.
RTE eCO2mixODRÉ / RTE, Licence Ouverte (Etalab)National nuclear generation, France.
EDFPublic EDF content, for informational useProduction-unit updates, France.
IAEA NewsIAEA, cited with attribution and the reading dateEvents rated on the INES scale.
USGSPublic domain (U.S. government work)Earthquakes of magnitude 4.5 or more within 150 km of a plant: context, not an incident.
JAIF (Japan Atomic Industrial Forum)Public Japan Atomic Industrial Forum publication, for informational usePer-unit status of Japan's 33 units, table updated once a month.
ONS (Operador Nacional do Sistema Elétrico, Brasil)ONS open data, CC BY 4.0Actual hourly generation of Angra 1 and Angra 2, Brazil.
Central Electricity Authority (India)Public National Power Portal data (Ministry of Power, India)Daily exceptions report: units under outage or restriction.
RosenergoatomPublic information from the state operator (Rosenergoatom, a Rosatom subsidiary)Last reported movement per unit, Russia.
ENTSO-E Transparency PlatformENTSO-E Transparency Platform terms of use, with attributionProduction unavailabilities reported within an hour across Belgium, Spain, the Netherlands, Finland, Czechia, Slovakia, Hungary, Slovenia, Switzerland, Bulgaria and Romania.

Official communiqués

SourceLicenseWhat it contributes
Regulators, operators and governments (19 official channels)Each release belongs to its issuer; the original is linkedNRC and DOE (United States), CNSC and Bruce Power (Canada), CNEA, ARN and Nucleoeléctrica Argentina (Argentina), Vattenfall (Sweden), EDF (France), ČEZ (Czechia), ENSI (Switzerland), NEK Krško (Slovenia), Kozloduy NPP (Bulgaria), ONR (United Kingdom), Rosenergoatom (Russia), ENEC (United Arab Emirates), Kansai Electric (Japan), CGN and CNNC (China).
Fuel-cycle companies (11 official channels)Each release belongs to its issuer; the original is linkedCameco and NexGen Energy (Canada), Kazatomprom (Kazakhstan), Urenco, Centrus Energy, Westinghouse, Framatome, Global Laser Enrichment, Energy Fuels and Paladin Energy, and CNEA (Argentina).
World Nuclear News© World Nuclear Association — title, date, feed summary and linkThe site's one secondary source: title, date, link and the feed summary, always attributed to the World Nuclear Association by its full name; never as the source of a figure.

How a value is chosen when sources disagree

When two sources give different values for the same fact, the one that carries an effective date wins over the one that doesn't, regardless of which source is generally more authoritative.

Beyond that, the authority order depends on the fact. Status and dates: an official statement from the operator or the national regulator, then IAEA PRIS, then Global Energy Monitor, then Wikipedia. Net capacity: IAEA PRIS first, then the operator, then Global Energy Monitor and Wikipedia. Research reactors: the IAEA RRDB, then the operator. Fuel-cycle facilities: the operator, then the World Nuclear Association and the IAEA, then Wikipedia. A status regression — from "operating" to "under construction", for example — needs an official source: a community source such as Wikipedia or Wikidata never regresses a status on its own.

When two readings sit at the same authority level and differ, the one published more recently wins, not the one consulted most recently.

An editorial correction from Reactor Atlas — always citing the primary source URL behind it — can outrank that order, but only to fix a data-reading error (a misread cell) or to add a fact the automated pipeline cannot see on its own yet.

No disagreement is hidden: when two sources don't match, both readings are kept with their source and date; neither is deleted or overwritten.

Capacity is shown on a net basis where IAEA PRIS, the operator or Wikipedia publish it that way; where the only available figure is the gross or announced project capacity, that is the figure shown. Gross also appears as an additional figure when the source gives both.

Definitions

Net vs. gross capacity
Gross capacity is what the electrical generator produces; net is what leaves the plant toward the grid, after the plant's own consumption and transformer losses are subtracted. Reactor Atlas shows net as the headline figure and gross as an additional figure when the source gives it.
Operating vs. grid connection vs. commercial operation
Grid connection is a new unit's first synchronization; commercial operation is the date the operator declares it in regular service, usually weeks or months later. First criticality is the reactor's start-up, weeks before grid connection, and is not the date the site shows. The in-service year uses the commercial-operation date when the source gives one; if not, first grid-connection; if that's missing too, the start-up year Global Energy Monitor publishes; and for a handful of historical units with no published date at all, an estimate based on construction start, flagged as such on the sheet.
Operating
It is in service and generates electricity on a regular basis, even though at a given moment it may be shut down for refueling or maintenance.
Operation suspended
The unit is out of service for an outage the source doesn't yet treat as final.
Under construction
Work has actually started: there is a first-nuclear-concrete date, or the source confirms construction is under way. An announced project is not enough on its own. IAEA PRIS criterion: it counts from the first structural concrete of the nuclear island (the reactor building) to first grid connection; site works and permits don't count, and non-power test reactors are not power units.
Planned
The project is announced or approved, but there is no confirmed construction-start date yet.
Shut down
Permanent retirement from service, with or without a published closure date.
A research reactor's thermal power
Most research reactors don't generate electricity, so they are measured by thermal power in kW — the rate at which the core releases energy — rather than MWe.
Research reactor: operating
The reactor is running under normal operation.
Research reactor: temporary shutdown
The reactor is halted for a shutdown the source doesn't treat as final.
Research reactor: shut down
The reactor has permanently stopped operating.
Research reactor: decommissioned
The reactor has been decommissioned: fuel removed and its systems dismantled.
Research reactor: unknown
No public source gives the reactor's current status.

How often it updates

Power and research reactors
Once a month (the monthly data sync), with an editorial review before it publishes.
Electricity mix by country
Once a month, in the same sync.
Real-time signals
Hourly sources (regulators, grid and plant operators) are checked every hour; daily sources, such as the NRC's daily report, every six hours.
Official communiqués and World Nuclear News
Every six hours.
Email summary
Weekly by default; anyone can also set up their own alerts with instant, daily or weekly frequency, by country, plant or signal type.
The "Data: … · updated on …" line
Shown at the foot of every plant, country or research-reactor sheet, with the most recent date among the sources actually behind what's on screen.

Corrections and contact

Every plant, research-reactor and fuel-facility sheet has a "Report a wrong value" button at the foot, opening a short form: which value is wrong and what the correct source is. Open it from the map, on any plant, research reactor or facility.

Every correction that gets incorporated is documented with the primary source URL behind it, the same as any other reading: what other sources said is never deleted or overwritten.

Data licensing and enterprise use: get in touch through fedecaccia.com.