Spain Spain · 40.702, -2.623

Trillo

Trillo, nuclear power plant in Spain, operates one pressurized water reactor with 1,003 MW net installed capacity and has been in service since 1988.

Unit Trillo 1 has been operating for 38 years, since 1988. Its 1,003 MW net are enough to supply about 3,160,000 households.

Country
Spain
Units
1
Technology
PWR
Net capacity
1,003 MWe
First grid connection
1988
Operator
Centrales Nucleares Almaraz-Trillo
Owner
Iberdrola; Gas Natural; Hidroeléctrica del Cantábrico; Nuclenor
Status
Operating
Operating capacity
1,003 MWe
net electrical
Units
1
1 operating
First start-up
1988
Trillo
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Trillo 1Pressurized water (PWR)Siemens-KWU 3-loop (PWR 3LP)Operating1,0033,010Aug 17, 1979May 23, 1988—80.9 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Trillo 1, a 1,003 MWe PWR (Siemens-KWU 3-loop (PWR 3LP)), started construction in 1979, was connected to the grid in 1988 and is still operating, with a 80.9% load factor in 2024.

Operator: Centrales Nucleares Almaraz-Trillo.

Owner: Iberdrola; Gas Natural; Hidroeléctrica del Cantábrico; Nuclenor.