🇷🇺 Russia · 69.996, 135.571

Ust-Kuyga

One reactor PWR, in service since 2028.

Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2028

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Ust-Kuyga 1Pressurized water (PWR)Planned552028 (planned)

Operator: Rosenergoatom.

Owner: Rosatom.

More information