Russia Russia · 69.100, 169.414

Cape Nagloynyn floating

Cape Nagloynyn floating, nuclear power plant under construction in Russia, will add 2 pressurized water reactors with 212 MW gross projected capacity.

Cape Nagloynyn floating 1 is under construction, with grid connection expected in 2028.

Country
Russia
Units
3
Technology
PWR
Net capacity
—
First grid connection
2028
Operator
Atomflot; Rosenergoatom
Owner
Atomflot; Rosatom
Status
Under construction
Operating capacity
0 MWe
net electrical
Units
3
0 operating
First start-up
2028

Units

Data: Global Energy Monitor · updated on Aug 1, 2026

Cape Nagloynyn floating 1, a 106 MWe gross PWR (RITM-200S), is under construction, with grid connection expected in 2028.

Cape Nagloynyn floating 2, a 106 MWe gross PWR (RITM-200S), is under construction, with grid connection expected in 2028.

Cape Nagloynyn floating 3, a 106 MWe gross PWR (RITM-200S), is planned, with grid connection expected in 2028.

Operator: Atomflot; Rosenergoatom.

Owner: Atomflot; Rosatom (Cape Nagloynyn floating 1, Cape Nagloynyn floating 2, Cape Nagloynyn floating 3).