Cape Nagloynyn floating
Cape Nagloynyn floating, nuclear power plant under construction in Russia, will add 2 pressurized water reactors with 212 MW gross projected capacity.
Cape Nagloynyn floating 1 is under construction, with grid connection expected in 2028.
- Country
- Russia
- Units
- 3
- Technology
- PWR
- Net capacity
- —
- First grid connection
- 2028
- Operator
- Atomflot; Rosenergoatom
- Owner
- Atomflot; Rosatom
- Status
- Under construction
See also: alerts for this plant · every plant in Russia · every PWR reactor · how a PWR works
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Cape Nagloynyn floating 1 | Pressurized water (PWR) | RITM-200S | Under construction | 106 | — | — | 2028 (planned) | — | — |
| Cape Nagloynyn floating 2 | Pressurized water (PWR) | RITM-200S | Under construction | 106 | — | — | 2028 (planned) | — | — |
| Cape Nagloynyn floating 3 | Pressurized water (PWR) | RITM-200S | Planned | 106 | — | — | 2028 (planned) | — | — |
Data: Global Energy Monitor · updated on Aug 1, 2026
Cape Nagloynyn floating 1, a 106 MWe gross PWR (RITM-200S), is under construction, with grid connection expected in 2028.
Cape Nagloynyn floating 2, a 106 MWe gross PWR (RITM-200S), is under construction, with grid connection expected in 2028.
Cape Nagloynyn floating 3, a 106 MWe gross PWR (RITM-200S), is planned, with grid connection expected in 2028.
Operator: Atomflot; Rosenergoatom.
Owner: Atomflot; Rosatom (Cape Nagloynyn floating 1, Cape Nagloynyn floating 2, Cape Nagloynyn floating 3).