Lingen
One reactor BWR, in service since 1968.
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
1968

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Lingen | Boiling water (BWR) | BWR | Shut down | 183 | 520 | Oct 1964 | Jul 1968 | Jan 1977 | — |
Operator: Kernkraftwerk Lingen GMBH.
Owner: RWE Nuclear GMBH.