🇨🇳 China · 26.799, 120.152
Xiapu
2 reactors FBR, in service since 2026.
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2026
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Xiapu 1 | Fast breeder (FBR) | CFR-600 | Under construction | 642 | 1,882 | Dec 2017 | 2028 (planned) | — | — |
| Xiapu 2 | Fast breeder (FBR) | CFR-600 | Under construction | 642 | 1,882 | Dec 2020 | 2026 (planned) | — | — |
Operator: CNNC Xiapu Nuclear Power CO LTD.
Owner: China National Nuclear Power CO LTD [55%]; Fujian Funeng CO LTD [20%]; China Yangtze Power CO LTD [10%]; Huaneng Nuclear Power Development CO LTD [10%]; Ningde State-owned Assets Investment and Operation CO LTD [5%] (Xiapu 1, Xiapu 2).