ENES
United States United States · 64.670, -147.062

Eielson Air Force Base

Eielson Air Force Base, planned nuclear power plant in United States, is set to have one fast breeder reactor with 5 MW net projected capacity.

Country
United States
Units
1
Technology
FBR
Net capacity
First grid connection
2030
Operator
Owner
United States Department of the Air Force
Status
Planned
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2030

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Eielson Air Force BaseFast breeder (FBR)AuroraPlanned52030 (planned)

Data: Global Energy Monitor · updated on Aug 1, 2026

Eielson Air Force Base, a 5 MWe FBR (Aurora), is planned, with grid connection expected in 2030.