Russia Russia · 56.658, 84.948

Seversk

Seversk, nuclear power plant under construction in Russia, will add one fast breeder reactor with 300 MW net projected capacity.

Seversk 1 is under construction, with grid connection expected in 2029.

Country
Russia
Units
1
Technology
FBR
Net capacity
—
First grid connection
≈ 2029
Operator
Rosenergoatom
Owner
Rosatom
Status
Under construction
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
≈ 2029

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Seversk 1Fast breeder (FBR)BREST-OD-300Under construction300700Jun 8, 2021≈ 2029 (planned)——

Data: IAEA PRIS · editorial review · updated on Sep 21, 2026

Seversk 1, a 300 MWe FBR (BREST-OD-300), has been under construction since 2021, with grid connection expected in 2029.

Operator: Rosenergoatom.

Owner: Rosatom.